Start Your Construction Project in Patna with Clarity
Tell us what you are planning, configure the Basic Structure Plan and see an indicative project value before you confirm your enquiry.
Know what the estimate means before you proceed.
The planner is designed to support an informed first conversation. Final scope and commercial terms are confirmed later.
How the indicative estimate works
Enter the approximate ground-floor area; the estimate multiplies it by the selected floor count to estimate total built-up area, assuming similar floor sizes. The ₹1,050/sq. ft. Basic Structure Plan rate, finishing and material allowances apply across all floors. For any scope above Ground Floor Only, group piling is automatically included at ₹475/sq. ft. on the ground-floor area only. For Ground Floor Only, piling is optional at the same rate. It is a planning illustration; final floor areas and quotation are confirmed for the project.
Finishing and material choices
For total built-up areas up to and including 2,000 sq. ft., Standard adds ₹715/sq. ft. and Deluxe adds ₹950/sq. ft. Above 2,000 sq. ft., Standard adds ₹525/sq. ft. and Deluxe adds ₹935/sq. ft. across the full built-up area. Luxury starts at ₹1,200/sq. ft. above the Basic Structure Plan; its scope and price vary with customer requirements. Material allowances are planning assumptions and should be confirmed against the final specification and supplier quotations.
Group piling: suitability, benefits and estimate rate
A group-pile foundation uses multiple piles designed to work together. If site investigation finds weak or compressible near-surface soils, a suitably designed pile foundation may transfer loads to deeper, more competent ground and help meet the project's load and settlement criteria.
Whether this is suitable depends on the ground profile, building loads and pile-group analysis. Group behavior must be checked in design; piling is not a universal upgrade and does not guarantee zero settlement. The applicable Indian pile-foundation standard, soil investigation and structural design inform the final scope.
For this estimate, any scope above Ground Floor Only automatically includes ₹475 × the ground-floor area. For example, a 2,400 sq. ft. ground-floor area adds ₹11,40,000 for group piling, regardless of the number of upper floors. Ground Floor Only can add piling optionally at the same rate.
Scope changes
Changes requested after scope finalisation can affect cost, material requirements and project timelines.
Project timeline
Schedules depend on project size, approvals, design finalisation, site readiness and the agreed scope of work.
Payments and commercial terms
Applicable payment milestones and commercial terms are provided with the detailed quotation/agreement before project commencement.
One team from planning to execution.
Talk to Kryston before you decide.
If you are not ready to complete the planner, our team can help you understand the next practical step.